Troubleshooting a robotic system for an industrial / agricultural customer north of Woodstock.

Troubleshooting a robotic system for an industrial / agricultural customer north of Woodstock.

Just finished up installing some new lighting for an industrial customer J-Tech Ingersoll. We installed new lighting increasing there light level by 25% and also getting them a nice rebate from Hydro.
Helping out a residential customer after there basement flooded. We installed some temporary heat to make sure there pipes done freeze.

A commercial client in Woodstock taking advantage of our 24-hour service on Sunday after their heat stopped working.

Helping out an Industrial client in Woodstock with Belfor after a flood. installing a dehumidifier to dry out their building.

We were at one of our commercial electrical clients, Penningtons in London back in November. Installing some sign lighting and doing some lighting upgrades.

We are still installing hot tubs in December!!! Christmas came early for two couples in London yesterday who got their hot tubs delivered and installed.
Egan electric was installing a new heater and modifying the controls on a small dip tank for Tetra-Chem a new industrial customer in Ingersoll.
Working on keeping a machine safe by installing safety relays and door contacts in a plane in London.
Throw Back Thursday – Designing custom Controls for the old Kellogg’s dryer from London. In this project we did the electrical system design, panel building, PLC programming and HMI programming. The panel has temperature controls and electrical safety is all built in. Special thanks to our customer in Seaforth. It was a fun project.
